Reconstruction of the tower of the deanery church, 6 September 1927
Description:
The work was carried out by Leopold Pammr using 0.9 mm copper sheet. He used 40 metric quintals of it.
Automatic description:
Detail of a tall church tower under repair. The onion dome and clock stages are surrounded by wooden work platforms, with workers and a long boom visible on the roof.
This is automatically generated preview from raw scan. The quality of automatically generated previews might vary. The images are scanned in 16-bit depth and high resolution and it is possible to tune them, retouch the scratches and make details. See the galeries.